Friday, 5 September 2014
Thursday, 4 September 2014
Soul Fire Saints Feedback for Music Video
We have collected feedback from Soul Fire Saints and acted upon it accordingly to create a video that successfully promoted the band and met our brief.
Wednesday, 3 September 2014
Monday, 16 June 2014
Evaluation
For our video we need to:
Identify areas for improvement; we need to complete our video by finishing adding the footage in the chronological order of the narrative. We need to watch the footage over and identify any mistakes in the footage and edit them out.
Apply extended editing techniques; we need to continue to thoroughly edit our footage by changing the colour of certain shots, cutting specific shots and adding transitions.
Evaluate any technical support; we need to ensure that the television screen video is properly in situ with no unnatural movement.
Identify areas for improvement; we need to complete our video by finishing adding the footage in the chronological order of the narrative. We need to watch the footage over and identify any mistakes in the footage and edit them out.
Apply extended editing techniques; we need to continue to thoroughly edit our footage by changing the colour of certain shots, cutting specific shots and adding transitions.
Evaluate any technical support; we need to ensure that the television screen video is properly in situ with no unnatural movement.
Monday, 28 April 2014
Monday, 7 April 2014
LO2: Feedback on Rushes
Everyone who completed our survey was in agreement that the rushers we presented are in keeping with our original idea. Also we had good feedback on our progress so far; that our footage clearly demonstrates our concept, and with our editing styles and overall progress. In response to whether any improvements need to added people either didn't have any suggestions or wanted to see more camera angles in the scenes.
Objective for 7/4/14
For our final week before Easter we aim to:
- Complete our editing for our music video
- Finish all of the relevant documents and get them signed
- Collect feedback from the band on the music video so far
- Complete our editing for our music video
- Finish all of the relevant documents and get them signed
- Collect feedback from the band on the music video so far
Tuesday, 1 April 2014
Monday, 31 March 2014
Monday, 24 March 2014
Thursday, 20 March 2014
Contingency Plan
If everything goes to plan, we will be filming our music video on Saturday 29th March at 8:00am at Knowle Hill Care Home in Halfway. However, here is our contingency plan, just incase anything goes wrong.
Incase the venue we want is unavailable we have secured another venue to use instead; one of the band members mother-in-law's house. It will be available at the same time we plan to use the original venue.
Incase the make-up artist is unavailable (so far, she has not been in contact after we explained the arrangements to her) we have already researched into old people make up and practiced it in order for us to apply it ourselves.
For the latter half of the film we plan to use the O2 Academy on Saturday 5th April before the band's gig during the soundcheck. If this is not possible, we have a number of other venues lined up to use instead.
For the latter half of the film we plan to use the O2 Academy on Saturday 5th April before the band's gig during the soundcheck. If this is not possible, we have a number of other venues lined up to use instead.
Old People Make Up Tutorial - We found this one really helpful
Monday, 17 March 2014
LO2: Three objectives
Three objectives for todays lesson:
- Locate and book a new venue that is more suitable
- Find props
- Organise make up artists and book them
- Locate and book a new venue that is more suitable
- Find props
- Organise make up artists and book them
Saturday, 15 March 2014
Venue Scouting
We decided to look into several different venues for our shoot in order to decide which was most suitable. The first venue we went to was Intake Scout Group Hall:
Venue 1
We quite liked the venue, it was large and had a high roof so we wouldn't have to worry about the crane rig hitting the ceiling, a stage and a sound system to play the song. However, there wasn't a suitable enough space outside to film the car scene and it essentially didn't look like a genuine nursing home. After sending these images of the hall to our band we had a conversation and they decided it wouldn't be suitable for the video.
Venue 2
Chris said that alternatively, he could arrange for us to film in an actual nursing home. We followed him up on his offer and he visited the home the following week and sent us these images.
We agreed that this venue would be perfect for our video shoot; it looked like an actual nursing home, provided most of the props and there was sufficient space to film outside. This is the venue we ultimately decided to film at.
Venue 1
| Intake (270th) Scout Group Hall - Venue for Hire | |
| Intake Scout Group has a hall with stage available for hire, capacity 80 seated. The hall has a fully equipped kitchen and sound system. The hall hire is charged at £12 per hour (this price is supplied by the venue please check it yourself for accuracy). The scout hall is located in S12. | |
| |
|
We quite liked the venue, it was large and had a high roof so we wouldn't have to worry about the crane rig hitting the ceiling, a stage and a sound system to play the song. However, there wasn't a suitable enough space outside to film the car scene and it essentially didn't look like a genuine nursing home. After sending these images of the hall to our band we had a conversation and they decided it wouldn't be suitable for the video.
Venue 2
Chris said that alternatively, he could arrange for us to film in an actual nursing home. We followed him up on his offer and he visited the home the following week and sent us these images.
Knowle Hill
Streetfields, Halfway, Sheffield S20 4TB
We agreed that this venue would be perfect for our video shoot; it looked like an actual nursing home, provided most of the props and there was sufficient space to film outside. This is the venue we ultimately decided to film at.
Thursday, 13 March 2014
Wednesday, 12 March 2014
LO2: Task 2: Be Able to Pre-Production Materials for an Original Audio-Visual Promo
PRODUCTION SCHEDULES
EVIDENCE OF INITIAL CONTACT WITH BAND
PRE-PRODUCTION MATERIALS
LOCATION ONE: MAGNA
RECCE
RECCE CHECKLIST
LOCATION RECONNOITRE SURVEY
SHOOT LOCATION INSPECTION CHECKLIST
RISK MANAGEMENT PLAN
REQUIREMENTS
CALL SHEET
LOCATION TWO: KNOWLE HILL
CALL SHEET
SHOOT LOCATION INSPECTION CHECKLIST
FLOOR PLAN
RECCE
RECCE CHECKLIST
SHOT PLANS
GANTT CHART
OTHER PLANNING